TUBE-SHEET TO TUBE EXPANSION PROCEDURE
Scope:
Scope of Tube sheet expansion procedure describes and specifies
the technique, acceptance standards, and documentation requirement for tube
expansion in heat ex changers.
Reference:
The current edition or addenda of the
following documents has been referred in the preparation of Tube sheet Expansion procedure.
I.
TEMA
II.
ASME section VIII div. 1 –
Rules for construction of pressure vessel.
Equipment to be used for the expansion:
I.
An automatic torque control
unit shall be used for carrying out the expansion.
II.
The roller to be used shall
have a generous radius at both the ends so as to ensure that there are no sharp
steps on the expanded tube ID & to ensure that there is a smooth transition
from expanded to unexpanded zone of the tubes.
III.
Measuring instrument like Dial
gauge & outside Micrometer / Vernier.
Expansion Mock – Up:
I.
Take 300 x 300 mm side mock up
block with thickens equal to tube sheets with same material as that of tube
sheet. Drill the tube holes in the mock up block, of diameter & pitch as
per Tubesheet drawing.
II.
Measure and record the tube
hole inside diameter (ID).
III.
Cut tube 150 mm long other than
tube sheet thickness and tube projection length as per drawing from the same
material & wall thickness to be used in job.
IV.
Measure & record tube ID
& tube OD.
V.
Put mandrel of proper length,
based on required expansion length.
VI.
Carry out expansion of tube of
at least of 09 nos. Tube by mechanical expansion ( Tube rolling).
VII.
Measure & record increase
in the tube ID & the torque value.
VIII.
Calculate % of thinning of tube
using the following formula.
(tube sheet hole ID – Expanded ID)
% Thinning = {1 -
----------------------------------------------------------- } x 100
(
Tube OD – Tube ID)
IX.
Thinning the tube should be in
the range of 1 – 5 %.
X.
Following details shall be
noted:
a)
Data indicating the tube hole
ID, Tube OD & Tube ID before expansion & tube ID after expansion for
each tube expanded.
b)
The torque value used for each
tube expanded.
c)
The make, model no. &
serial no of the torque control unit used for the expansion.
d)
After establishing the torque
valve on mock – up block to get the required % thinning tabulate the
measurements in the attached format.
Set – up And Expansion of Tubes in Tube sheet:
I.
Insert the tubes in the
tubesheet from one end.
II.
Set the tube projection to max.
3mm in one end, as required in the drawing. Carry out expansion in one end.
Check the projection on the other end. If the tube projection is more than 4mm
then the tube ends are to be trimmed to maintain the projection at 4mm. Carry out
expansion on the other end.
Inspection after Expansion:
I.
100% tubes shall be inspected
to ensure that the tubes are expanded.
II.
Tube to tube sheet joint shall
be examined during hydro test to detect leakage, if any.
III.
In the event of leakage, the
tube shall be re – expanded. Care shall be taken to ensure that there is no
excessive thinning of the tubes.