- Code of construction of Pressure Vessel should be noted on Mechanical Data Sheet or Fabrication Drawing.
- Latest Applicable Code of Construction Shall be made in all aspects.
- Design and fabrication Drawing should be approved by the client before starting of fabrication of pressure vessel.
- Thickness Indicated on fabrication drawing shall be minimum Thickness and shall be achieved after fabrication or machining.
- Any Change in Thickness on higher side shall be acceptable but written approval shall be taken by Client before commencing of further work.
- Tolerance for fabrication shall be maintain within limits given by the client.
- Tested Material Should be used in fabrication of Pressure vessel.
- All External weld Shall be wire brush and weld spatter remove from joints completely.
- Vessel Shall be Cleaned from inside and all Dust,Dirt,Slag etc shall be removed before hydro testing of vessel.
- Vessel Shall be dried after Hydro testing.
- All Internal part preferably be of removable type and maximum weight of the individual piece shall not exceeds 20 kg.Unless noted otherwise on Mechanical datasheet .
- Only Qualified Welder Shall be Deployed for Fabrication of pressure vessels.
- Whenever Spot Radiography Specified on the Drawing it means that minimum 10% radiography of Longitudinal and Circumferential Seam. & 100% Radiography of all "T" joints.
- Nozzle Neck Shall be Made from Seamless Pipe & If Nozzle fabricated from Plate then Weld seam shall be 100 % Radio graphed.
- Dish end Shall be normally made from single plate. large sized Dish end may be fabricated by joining plates. this joint shall be 100% radiography after forming. Joint Location and Detail Indicated on fabrication Drawing & "T" Joint to be avoided.
- Internal Coil,Suction Heater,External Limpet Coil Shall be separately hydro tested When main Shell is not under hydro tested.
- All Manhole Cover or Blind Flanges weighing more than 30 Kg that shall be provided with Davits and hinges.
Learn Fabrication of Pressure Vessel,Heat Ex-changer,Storage Tank,Agitator,Distillation columns,Mixers or Blenders,Chimney,Evaporator, Dryer,Piping,Heavy Equipment Fabrication and other Process equipment's
Sunday, 23 October 2016
General Guaidline for Fabrication of Pressure Vessel
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment